How long does it take to get an enclosure?

Once a design for an enclosure from Covers in Play is worked out and all the options settled, the permit process is launched. Design drawings including site plan are generated and submitted for approval with you local municipality.

Once compliance with local bylaws and building codes are assured and municipal approval is granted, Covers in Play begins procurement and fabrication at our factory.  Once completed the unit is packed up and shipped to site in knock-down format. This allows for fast assembly and installation on site, usually in a week or two, depending on the size and complexity of the design.

The entire process from start to finish is typically in the 3 to 4 month range. A project can be expedited and completed faster if requested.